BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//The Data Center Engineer - ECPv6.18.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:The Data Center Engineer
X-ORIGINAL-URL:https://thedatacenterengineer.com
X-WR-CALDESC:Events for The Data Center Engineer
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260527T090000
DTEND;TZID=America/New_York:20260528T170000
DTSTAMP:20260421T214556Z
CREATED:20260421T213118Z
LAST-MODIFIED:20260421T214556Z
UID:2934-1779872400-1779987600@thedatacenterengineer.com
SUMMARY:Data Centre Design\, Engineering & Construction Summit 2026 — Ashburn
DESCRIPTION:Future Bridge’s 7th Data Centre Design\, Engineering & Construction Summit lands in Ashburn — ground zero for North American hyperscale — for two days focused squarely on how data centers get built. The audience is general contractors\, EPC firms\, MEP contractors\, structural engineers\, commissioning agents\, project management consultancies\, and owner’s-rep teams. Keynote sessions and panel tracks cover preconstruction\, site selection in power-constrained markets\, modular and prefab approaches\, MEP integration and commissioning\, structural and seismic design for AI-era rack loads\, cooling-system interfaces with the building envelope\, and labor/supply-chain planning for multi-gigawatt pipelines. \nThis is one of the few events where the conversation stays technical and stays with the builders. Expect working sessions on how liquid-cooling retrofits affect floor loads and drainage\, how rack density is pushing electrical backbone design\, what commissioning sequencing looks like when schedules compress\, and how owners are negotiating contracts in a market where every GC is capacity-constrained. \nAttend if you design\, build\, commission\, or audit data-center construction work. The Ashburn location also makes site tours and supplier meetings in Loudoun’s Data Center Alley easy to bolt on.
URL:https://thedatacenterengineer.com/event/data-centre-design-engineering-construction-summit-2026-ashburn/
LOCATION:Ashburn\, Virginia\, Ashburn\, VA\, United States
CATEGORIES:Construction & Design
END:VEVENT
END:VCALENDAR