Data Center Signals From Around The Web

We read dozens of data center news sources every day, so you don’t have to. Curated highlights for engineers and operators who need to stay ahead of what’s coming.

Meta speeds up fiber optic technician training to ease data center delays

EngineeringBusiness Insider|April 21, 2026

Meta is accelerating training programs for fiber optic technicians to address a critical shortage that’s delaying data center expansions. This initiative highlights the growing need for specialized skills in high-speed networking infrastructure amid surging AI demands.

  • Program targets training 500 technicians over the next 12 months through partnerships with community colleges in California and Virginia
  • Shortage of fiber splicers has delayed Meta’s data center projects by up to six months in key regions
  • Training focuses on fusion splicing, OTDR testing, and high-density fiber management for 400G networks
  • Meta allocates $10 million for the initiative, including equipment and certification costs
  • Effort aims to support deployment of 100,000 kilometers of new fiber optic cable in 2024
  • Similar bottlenecks affect competitors like Google and Amazon in Nevada and Oregon data center hubs
Read the full article →

Uptime Institute sees limited role for liquid cooling in AI

EngineeringUptime Institute|April 28, 2026
Uptime Institute emphasizes that liquid cooling remains niche in AI data centers, suited only for ultra-high-density setups. This insight helps engineers evaluate cooling options as AI compute demands intensify without overinvesting in specialized systems.
+

Energy storage’s role in stabilizing AI data center power

EngineeringRoland Berger|April 22, 2026
Roland Berger’s report highlights how energy storage systems address power volatility in AI data centers, which is essential as AI workloads cause rapid demand spikes that strain grids and increase costs. AI training can cause power demand to fluctuate by 20-50% in seconds, risking outages.
+

Scaling liquid cooling challenges in data center design

EngineeringYouTube (Datacenter Dynamics)|April 21, 2026
In this Datacenter Dynamics interview, host James Radings speaks with Rajat Bagghdad, senior mechanical engineer at Arcadis, about current challenges in data center cooling systems. Data center engineers should watch to gain insights into deploying liquid cooling at scale and addressing operational hurdles in high-density environments.
+

Federal agencies prepare regulations on data center energy use

EngineeringPOLITICO|April 20, 2026
Federal agencies are gearing up to impose new regulations on data centers to curb their escalating energy demands and environmental footprint driven by AI growth. This development matters for data center engineers as it may reshape facility designs, operational efficiencies, and compliance requirements nationwide.
+

Electric demand surge from data centers in Virginia and Texas

EngineeringBelfer Center for Science and International Affairs|April 20, 2026
A recent report analyzes the explosive growth of data centers in Virginia and Texas, detailing their outsized effects on regional power grids. Understanding these dynamics helps engineers plan for scalable, reliable electricity infrastructure amid rising AI and cloud demands.
+

Indiana’s Marshall County enacts immediate permanent data center ban

IndustryWSBT|April 20, 2026
Marshall County in Indiana has approved a permanent ban on data centers, effective immediately, potentially shifting development focus to more permissive regions. This move highlights escalating local regulatory hurdles for data center expansions amid concerns about infrastructure strain.
+

Get Data Center Engineering News In Your Inbox:

Popular Posts:

Engineering AI Rack Power: Infineon Answers the Questions Asked at OCP, live expert panel with Carl Smith, Davide Chiola and Michael Williams
AI data center architecture evolution and key findings from OCP
thumb-sst1-solid-state-transformers
Why line-frequency transformers fall short in AI data center power design
thumb-dc1-selection-guide
Data center semiconductor selection guide
abb-infinitus copy
ABB launches 800 VDC source-to-rack DC power portfolio for AI data centers
thumb-dc2-future-of-powering-ai
Redefining the power flow in and beyond AI data centers

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

Get Data Center Engineering News In Your Inbox: