Selection guide · 41 pages · ~35 min
Locked

Data center semiconductor selection guide

Selection guide · 41 pages · ~35 min
Locked

Data center semiconductor selection guide

← Back to Infineon at OCP 2026

Power engineers designing AI server racks face a topology fork: today’s 48 V single-phase infrastructure tops out around 250 kW per rack, while GPU clusters already push beyond that. Infineon engineers lay out every conversion stage from medium-voltage AC input to sub-1 V core rail, with validated reference design and solutions for each node.

Key functional blocks addressed:

  • Power Supply Unit
  • Battery Back-up Unit
  • IBC
  • Power path protection
  • Second stage
  • Reliability modeling

Register to Download and Unlock Infineon’s Exclusive Content Hub

Executive interviews, technical documents and reference designs from Infineon on powering the AI data center, plus a live expert panel after OCP Global Summit. Register once to unlock everything and reserve your seat for the panel.

Data center selection guide41 pages
The future of powering AI24 pages
SST whitepaper5 pages
Expert panel seatThu, Oct 29, 2026

We’ll email you a confirmation link. The three documents, the interview and your panel seat unlock as soon as you confirm.
Infineon

This resource hub is sponsored by Infineon Technologies. Documents are provided by Infineon; interviews are produced by The Data Center Engineer.

Back to the hub