Whitepaper · 24 pages · ~25 min
Locked

Redefining the power flow in and beyond AI data centers

Whitepaper · 24 pages · ~25 min
Locked

Redefining the power flow in and beyond AI data centers

← Back to Infineon at OCP 2026

As AI power demand scales from kilowatt-level processors to megawatt racks and gigawatt-scale campuses, traditional power architectures are reaching their limits. This whitepaper explores seven key predictions for the future of AI power delivery, from vertical power delivery and high-voltage server boards to disaggregated rack architectures, HVDC distribution and data center-wide DC microgrids.

Whitepaper · PDF · 24 pages · ~25 min read · Dr. Gerald Deboy and Dr. Fanny Björk

  • Bus-bar current limits that force the break from 48 V architecture
  • Hold-up capacitor space penalty in conventional 12 kW PSU designs
  • Trade-offs between 800 V-to-12 V and 800 V-to-50 V-to-6 V power delivery
  • Grid stability risk from unmanaged GPU transient load patterns

Register to Download and Unlock the Infineon at OCP 2026 Hub

Executive interviews, technical documents and reference designs from Infineon on powering the AI data center, plus a live expert panel after OCP Global Summit. Register once to unlock everything and reserve your seat for the panel.

Selection guide41 pages
Redefining the power flow24 pages
Line-frequency transformers5 pages
Grid to core interviewVideo · ~20 min
Expert panel seatThu, Oct 29, 2026

We’ll email you a confirmation link. The three documents, the interview and your panel seat unlock as soon as you confirm.
Infineon

This resource hub is sponsored by Infineon Technologies. Documents are provided by Infineon; interviews are produced by The Data Center Engineer.

Back to the hub