Data center semiconductor selection guide

← Back to Infineon at OCP 2026

Power engineers designing AI server racks face a topology fork: today’s 48 V single-phase infrastructure tops out around 250 kW per rack, while GPU clusters already push beyond that. Infineon engineers lay out every conversion stage from medium-voltage AC input to sub-1 V core rail, with validated reference design and solutions for each node.

Selection guide · PDF · 41 pages · ~35 min read · Infineon Technologies

  • 12 kW single-phase PSU at 97.8% peak efficiency, 113 W/in³
  • BBU reference designs at 12 kW and 24 kW with 4× density gain
  • 800 V–50 V HV IBC at 98% full-load efficiency, 2.5 kW/in³
  • Hot-swap and eFuse controllers for 48 V and ±400/800 V buses

Key functional blocks addressed:

  • Power Supply Unit
  • Battery Back-up Unit
  • IBC
  • Power path protection
  • Second stage
  • Reliability modeling

Download the full selection guide from Infineon:

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.

Popular Posts:

TDK-Webinar-Banner-v3
Webinar: Powering next-generation solid-state transformers with TDK technology
Frontale_(sh)
Mitsubishi Electric launches 1.75 MW magnetic-bearing air-cooled chiller for AI data centers
Data-Center-World-Power-PR-Graphic-FINAL
SENS PowerCab2 DC power platform cuts battery rooms for 1 GW campuses
PR-09-16-2026_image_Avicena
Avicena to demo connectorized microLED optical interconnect for AI at ECOC 2026
Screenshot
Five AI data centers to reach 1 GW power capacity in 2026, new analysis shows

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.