The fourth edition of Future Bridge’s Berlin summit on decarbonizing data center operations. Two days of operator case studies and regulatory briefings on the specific mechanics of hitting net-zero targets: heat reuse into district networks, on-site generation and storage, 24/7 carbon-free energy matching, and the reporting obligations now attached to European data centers under the Energy Efficiency Directive.
This is a practitioner event rather than a policy one. The sessions worth planning around are the ones where an operator walks through the engineering of a specific heat-reuse connection or a behind-the-meter battery project, including the parts that did not work. Berlin’s own district-heating integrations and the German efficiency law make the host city a live case study.
Produced by: Future Bridge Events
Format: Two-day summit, case-study driven
Focus: Net-zero operations, heat reuse, carbon-free energy procurement, EU efficiency reporting, on-site storage
Relevance to data center engineering: Heat-recovery loop design, BESS integration, PUE/ERF reporting under the EU Energy Efficiency Directive