NVIDIA’s annual GPU Technology Conference has become the event where the next generation of AI infrastructure gets specified. The keynote sets rack power, cooling, and networking requirements for the industry for the following two years; the several hundred technical sessions cover everything from CUDA to the mechanical design of the rack-scale systems the keynote introduces.
For facilities engineers, GTC is required reading even if you never attend. The announcements here are why a 2025 rack was 120 kW and a 2027 rack will be considerably more, and the sessions from NVIDIA’s data center engineering teams and their partners on liquid-cooling manifolds, 800 V DC power distribution, and the thermal envelope of each new platform are the most authoritative source available. The exhibition brings every major server, cooling, and power vendor with their reference designs for the current platform.
Produced by: NVIDIA
Format: Keynote, technical conference, training, exhibition
Focus: AI accelerators, rack-scale systems, AI networking, software, data center reference designs
Relevance to data center engineering: Next-generation rack power and thermal requirements, liquid-cooling and DC power distribution reference designs, AI factory facility planning











