Data Center Signals From Around The Web

We read dozens of data center news sources every day, so you don’t have to. Curated highlights for engineers and operators who need to stay ahead of what’s coming.

PJM power market outlook addresses data center load growth challenges

EngineeringYouTube (Switched On)|April 16, 2026

In the Switched On podcast by Bloomberg NEF, host Tom Rowland-Rees interviews analysts Lara Camman and David Mohamadi about the PJM Power Market Outlook 2026 report. They discuss how data centers are driving rapid load growth in the largest US power market, pressuring supply and capacity, which data center engineers should watch to understand grid evolution and demand management strategies.

  • PJM enters a period of rapid load growth driven largely by data centers after years of steady demand
  • Load surge reshapes the system, pressures supply, and pushes capacity prices to record highs
  • Options to meet demand include building new supply faster or managing demand, with balance complicated by competing interests
  • Modeling PJM combines challenges from other markets, such as large load growth like ERCOT, carbon markets like California, gas-to-coal switching like MISO, and behind-the-meter solar plus offshore wind like New York ISO
  • Data center load growth concentrates in PJM South, requiring regional placement and handling considerations in scenarios

Uptime Institute sees limited role for liquid cooling in AI

EngineeringUptime Institute|April 28, 2026
Uptime Institute emphasizes that liquid cooling remains niche in AI data centers, suited only for ultra-high-density setups. This insight helps engineers evaluate cooling options as AI compute demands intensify without overinvesting in specialized systems.
+

Energy storage’s role in stabilizing AI data center power

EngineeringRoland Berger|April 22, 2026
Roland Berger’s report highlights how energy storage systems address power volatility in AI data centers, which is essential as AI workloads cause rapid demand spikes that strain grids and increase costs. AI training can cause power demand to fluctuate by 20-50% in seconds, risking outages.
+

Meta speeds up fiber optic technician training to ease data center delays

EngineeringBusiness Insider|April 21, 2026
Meta is accelerating training programs for fiber optic technicians to address a critical shortage that’s delaying data center expansions. This initiative highlights the growing need for specialized skills in high-speed networking infrastructure amid surging AI demands.
+

Scaling liquid cooling challenges in data center design

EngineeringYouTube (Datacenter Dynamics)|April 21, 2026
In this Datacenter Dynamics interview, host James Radings speaks with Rajat Bagghdad, senior mechanical engineer at Arcadis, about current challenges in data center cooling systems. Data center engineers should watch to gain insights into deploying liquid cooling at scale and addressing operational hurdles in high-density environments.
+

Federal agencies prepare regulations on data center energy use

EngineeringPOLITICO|April 20, 2026
Federal agencies are gearing up to impose new regulations on data centers to curb their escalating energy demands and environmental footprint driven by AI growth. This development matters for data center engineers as it may reshape facility designs, operational efficiencies, and compliance requirements nationwide.
+

Electric demand surge from data centers in Virginia and Texas

EngineeringBelfer Center for Science and International Affairs|April 20, 2026
A recent report analyzes the explosive growth of data centers in Virginia and Texas, detailing their outsized effects on regional power grids. Understanding these dynamics helps engineers plan for scalable, reliable electricity infrastructure amid rising AI and cloud demands.
+

Get Data Center Engineering News In Your Inbox:

Popular Posts:

mike-nolan-PPST
How to burn-in test megawatt power equipment without drawing a megawatt from the grid
Xendee
Bring your own power: Why data center microgrids are shifting from backup posture to strategy
Elvis-Leka,-New-Product-Development-Engineer-—-Parker,-Sporlan-Division
From air to two-phase liquid: how rack cooling options compare on density and risk
Why your data center needs 135% cooling capacity- Munters
Why your data center needs 135% cooling capacity
Near-Packaged-Optics--Rethinking-the-AI-Data-Center-Interconnect
Near-packaged optics: rethinking the AI data center interconnect

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

Get Data Center Engineering News In Your Inbox: