Skip to content
  • Home
  • Events
  • Contact Us
  • Terms of Use
  • Privacy Policy

Day: September 3, 2025

proteanTecs launches LVTS sensor for 2nm chip monitoring in data centers and AI hardware

September 3, 2025

Sitetracker demonstrates data center software platform to accelerate project delivery and optimize asset management

September 3, 2025

Parade Technologies launches PCIe Gen 6 linear redrivers for high-speed data center applications

September 3, 2025

Certarus secures CNG supply agreement for on-site power generation at major hyperscale data center

September 3, 2025

Prometheus Hyperscale and Conduit Power partner to deliver hybrid power solutions for AI data centers in Texas

September 3, 2025

Flexential expands data center interconnection mesh for scalable, multi-site connectivity across FlexAnywhere platform

September 3, 2025

Acer launches compact AI workstation featuring NVIDIA Grace Blackwell Superchip

September 3, 2025

Get Data Center Engineering News In Your Inbox:

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

Contact Us

Engineering Deep Dives

How CDU location can change UPS count, redundancy design, and retrofit complexity

Advanced cooling methods for data center power electronics

How to burn-in test megawatt power equipment without drawing a megawatt from the grid

Latest Data Center Engineering News

Nidec develops 300 kW in-rack CDU for AI liquid cooling

June 8, 2026

Infineon’s SiC boosts Siemens SENTRON 3QD2 solid-state circuit breaker for data centers

June 8, 2026

TDK’s new B25696H film capacitors bring 30 nH ESL and 200,000-hour lifetime to SiC power converter designs

June 8, 2026

Patented base system boosts air-cooled chiller capacity up to 25% without water

June 8, 2026

Xos launches 2.5 MWh Power Hub BESS for data centers needing fast power

June 8, 2026

Sub-THz wireless interconnect targets AI racks with 1.6 Tbps links

June 5, 2026

Vertiv fluid commissioning service recycles flush water, cuts use up to 78%

June 5, 2026

How CDU location can change UPS count, redundancy design, and retrofit complexity

June 5, 2026
More News
  • Home
  • Events
  • Contact Us
  • Terms of Use
  • Privacy Policy
  • Home
  • Events
  • Contact Us
  • Terms of Use
  • Privacy Policy