AFF — leaderboard ()

Corning licenses PRIZM TMT ferrules for higher-density AI data center fiber connectivity

Corning has added PRIZM TMT optical ferrule technology to its AI data center connectivity portfolio through a licensing collaboration with US Conec. The move targets higher fiber counts in tighter spaces inside data centers, as operators push more optical links deeper into both scale-up and scale-out AI networks.

Corning becomes a licensee of PRIZM TMT, which uses precision-aligned microlenses rather than direct fiber-to-fiber contact. Corning says the approach is intended to support denser optical connectivity, faster and more reliable installation, and higher contamination resistance, with a reduction in total cost of ownership in demanding AI deployments.

The practical driver is familiar: as AI clusters grow and interconnect requirements climb, the number of optical connections in a single server rack or switch rack can rise quickly. Connector density, insertion performance, and install speed start to matter as much as the transceivers—because field time, rework risk, and cleanliness constraints can become the bottleneck long before you run out of front-panel real estate.

“AI infrastructure is pushing optical connectivity into new and more demanding environments,” said Mike O’Day, senior vice president and general manager of Corning Optical Communications. “By licensing PRIZM TMT, Corning is strengthening its ability to deliver scalable, fiber-rich solutions that help customers build larger, faster, and more efficient AI clusters, while aligning closely with the broader industry ecosystem.”

Corning plans to highlight PRIZM TMT technology at OFC 2026.

Source: Corning

Emerson — below-posts ()

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.

AFF — tower ()

Popular Posts:

TDK-Webinar-Banner-v3
Webinar: Powering next-generation solid-state transformers with TDK technology
abb-infinitus copy
ABB launches 800 VDC source-to-rack DC power portfolio for AI data centers
cdm-5-mw-turnkey-ai-factory
CDM launches modular AI data center platform from 750 kW to 6 MW blocks
Dr. Fanny Björk, Infineon — Microseconds, not milliseconds
Grid to core: the case for deleting every conversion stage you can
thumb-dc1-selection-guide
Data center semiconductor selection guide

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

TDK — tower ()

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.

Chroma — leaderboard