Chroma — leaderboard

Nickel-zinc UPS retrofit kit drops into VRLA cabinets for 15-year life

ZincFive has introduced a Nickel-Zinc (NiZn) Retrofit Kit aimed at upgrading existing uninterruptible power supply (UPS) battery installations in mission-critical environments. The kit targets sites running legacy valve-regulated lead-acid (VRLA) strings, with ZincFive pitching it as a turnkey way to move to nickel-zinc chemistry without a full UPS battery system replacement.

The company describes the NiZn Retrofit Kit as a drop-in replacement for VRLA batteries that doesn’t require cabinet enclosure replacement, system redesign, or operational disruption. It’s built for compatibility with common three-phase UPS architectures and legacy cabinet form factors, with “installation-optimized system designs” intended to make retrofits repeatable across multiple sites.

For data center operators, the practical hook is avoiding the cost and risk of ripping out and rebuilding battery cabinets while still changing out the energy storage chemistry. Brownfield UPS work is where schedules are tight and access can be constrained, so a retrofit that keeps existing enclosures and layouts can reduce the scope of work and the downtime planning burden—if the “drop-in” promise holds up in the field.

ZincFive is also leaning on safety and compliance advantages it associates with nickel-zinc versus lithium-ion in retrofit environments. The company says its nickel-zinc chemistry avoids thermal runaway risk and “many of the regulatory challenges” tied to lithium-based systems, making it a fit for occupied or space-constrained sites. It also claims the NiZn Retrofit Kit can extend battery life to 15 years, compared with VRLA replacement cycles it characterizes as typically five to seven years.

“For the first time, operators have a practical path to extend battery life to 15 years while upgrading safety, sustainability, and performance – all within existing infrastructure,” said Tod Higinbotham, CEO of ZincFive.

Source: ZincFive

Chroma — below posts

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.

Sponsored: Infineon at OCP 2026: Exclusive Content Hub. Executive interviews, technical documents, reference designs, and live expert panel. Unlock the hub.
Chroma — tower

Popular Posts:

Frontale_(sh)
Mitsubishi Electric launches 1.75 MW magnetic-bearing air-cooled chiller for AI data centers
3
3.2T near-packaged optics uses glass substrate to cut AI switch power 50%
tranetechnologies
Trane demos 800 VDC chiller for AI data centers, 3.5 MW cooling capacity
LiquidJet-Diamond-Oct-2026
LiquidJet Diamond coldplate claims 35% more AI tokens per watt
Giuseppe Bernacchia, distinguished engineer at Infineon
Infineon on protecting the 800 V rack: fast enough to save it, slow enough not to trip it

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

TDK — tower ()

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.

TDK — leaderboard ()