TDK — leaderboard ()

YES data center packaging tools advance panel-level glass substrate manufacturing

Yield Engineering Systems (YES) has announced receipt of multiple tool orders from a global AI infrastructure company. These orders, according to YES, cover its portfolio of dry and wet process systems, specifically supporting panel-level manufacturing on glass substrates for next-generation data center and high-performance computing (HPC) packaging.

YES states that its systems will be installed in advanced packaging lines dedicated to hyperscale AI workloads. Applications include training, inference, networking, and co-packaged optics. The company reports that this milestone reflects an industry shift toward glass-based 2.5D and 3D packaging in response to increasing system performance, density, and thermal demands.

The suite of YES equipment ordered for panel-level packaging on glass substrates includes:

  • VertaCure: automated vacuum curing systems designed for solvent removal, uniform heating, and particle mitigation
  • VertaPrime: low-vacuum vapor deposition systems optimized for adhesion and process readiness
  • VeroFlex FAR: precision reflow systems delivering uniform temperature ramping for interconnect formation
  • TersOra: edge-zone removal platforms for precise and clean edge definition
  • SURE Wet Process Platform: wet etch and cleaning systems tailored for large-panel manufacturing

This order targets advanced packaging requirements in the data center and HPC market. YES also notes that glass substrates are becoming preferred in 2.5D and 3D packaging for their dimensional stability and electrical characteristics. YES claims it supports volume manufacturing transitions from wafer to panel formats, with regional capacity in Singapore.

Source: Yield Engineering Systems

AFF — below-posts ()

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.

AFF — tower ()

Popular Posts:

TDK-Webinar-Banner-v3
Webinar: Powering next-generation solid-state transformers with TDK technology
Frontale_(sh)
Mitsubishi Electric launches 1.75 MW magnetic-bearing air-cooled chiller for AI data centers
Data-Center-World-Power-PR-Graphic-FINAL
SENS PowerCab2 DC power platform cuts battery rooms for 1 GW campuses
Screenshot
Five AI data centers to reach 1 GW power capacity in 2026, new analysis shows
PR-09-16-2026_image_Avicena
Avicena to demo connectorized microLED optical interconnect for AI at ECOC 2026

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

Chroma — tower

Get Data Center Engineering News In Your Inbox:

By subscribing, you agree to our Privacy Policy and Terms of Use. You can unsubscribe at any time.

Chroma — leaderboard