Infraeo launches 9-meter 800G OSFP AEC to advance AI and data center server connectivity

Infraeo has announced the launch of a 9-meter 800G Octal Small Form-factor Pluggable (OSFP) Active Electrical Cable (AEC), expanding its Hairtail+ product line targeting high-speed, long-reach copper connectivity for artificial intelligence (AI) and data center networks. Infraeo claims this solution sets a new performance standard by delivering optical-grade reach and signal integrity for copper connections at a reduced cost.

The new 9-meter AEC integrates retimer digital signal processor (DSP) technology to enable low-latency, high-integrity 800G signaling over distances traditionally requiring optical interconnects. According to Infraeo, this design achieves a pre-Forward Error Correction (FEC) bit error rate (BER) better than 1E-8 across the full cable length. The Hairtail+ product family, which previously included a 7-meter 800G AEC, is designed to offer error-free copper connectivity options that compete with optical alternatives.

The 800G OSFP AEC family is available in several configurations to support different data center system architectures, including OSFP-FT to OSFP-FT, OSFP-FT to two OSFP right-hand side (RHS), and OSFP-FT to two QSFP112 variants. This flexibility aims to address deployment needs in AI cluster environments and data center infrastructure with high-density, multi-rack architectures.

“AI clusters see the benefit of copper interconnects and are now looking to span across several racks,” said Rakesh Sambaraju, EVP at Infraeo. “Our 7-meter AEC already delivers error-free performance, and the 9-meter version extends that capability even further. Retimer DSP technology has come a long way, and by combining high-performance DSP with Infraeo’s proprietary signal integrity and cable assembly technology, we’ve created a cost-effective, high-performance alternative to optics, purpose-built for next-generation AI data centers.”

Source: Infraeo

Get Data Center Engineering News In Your Inbox:

Popular Posts:

1765906506220
Tritium launches 800 VDC bidirectional inverter for data centers and renewable energy sites
Water_From_Air_Data_Center_Rendering_Nov_2025
iMasons selects Water From Air for data center waste heat-to-water innovation
Screenshot
Five AI data centers to reach 1 GW power capacity in 2026, new analysis shows
68e79d30a17eea847251fae6_img-home-product-liquidjet-main
Frore Systems updates LiquidJet direct-to-chip coldplate for 1,950 W NVIDIA Rubin data center GPUs
River Bend Rendering
Hut 8 announces $7 billion, 245 MW hyperscale data center IT lease with Fluidstack backed by Google

Share Your Data Center Engineering News

Do you have a new product announcement, webinar, whitepaper, or article topic? 

Get Data Center Engineering News In Your Inbox: